Pamplona Water

150 m³/h WTP for Pamplona's industrial water supply

Water treatment with automated clarifier bottom discharge and filter backwashing.

Home Cases 150 m³/h WTP for Pamplona's industrial water supply
getting to know the solution

More efficiency,
less waste.

Linsul developed a new water treatment plant to supply Pamplona's pork processing plant in Rio do Sul, Santa Catarina. The WTP has a stated nominal capacity of 150 m³/h and was designed for a facility with a slaughter capacity of 2,500 animals per day.

Challenge

The project had to meet requirements for performance, treated water quality and reliability of the industrial water supply. The solution included a stated minimum capacity of 120 m³/h and automation features for clarifier and filter routines.

Linsul solution

The plant was designed with a nominal capacity of 150 m³/h. The supply included automated clarifier bottom discharge and automated filter backwashing. The project material also presents raw water and treated water parameters, organized in this case's technical specifications.
  • Nominal treatment capacity of 150 m³/h.
  • Stated minimum capacity of 120 m³/h.
  • Automated clarifier bottom discharge.
  • Automated filter backwashing.
  • Water supply for a pork processing plant with a capacity of 2,500 animals per day.
150 m³/h WTP for Pamplona's industrial water supply
project data

Technical specifications.

WTP nominal capacity
150 m³/h
Stated minimum capacity
120 m³/h
Facility slaughter capacity
2,500 animals/day
Automation
Bottom discharge and filter backwashing

Reported quality parameters

Turbidity Raw water ≤ 500 NTU Treated water < 0.5 NTU
Apparent color Raw water ≤ 250 mg/L Pt/Co Treated water < 15 HU
Total iron in raw water and iron in treated water Raw water ≤ 2 mg/L Fe Treated water < 0.3 mg/L
Oxygen consumed in acid medium Raw water < 8 mg/L O₂ Treated water Not reported
pH Raw water Not reported Treated water 5 to 7
see our cases

See examples
of cases like this:

WWTP and water treatment for Envases' new plant
Envases

WWTP and water treatment for Envases' new plant

Integrated WWTP and water treatment for Envases' new plastics recycling plant in Ponta Grossa.

See full case →
Tertiary flotation for wastewater treatment and reuse at Cedro Têxtil
Cedro Têxtil

Tertiary flotation for wastewater treatment and reuse at Cedro Têxtil

DAF unit applied to tertiary treatment at Cedro Têxtil, with an operating capacity of 150 m³/h and a focus on industrial reuse.

See full case →
Wastewater treatment and sludge dewatering at CETRIC
CETRIC

Wastewater treatment and sludge dewatering at CETRIC

DAF unit, rotary drum screen and four sludge dewatering presses for CETRIC's operation in Chapecó.

See full case →

Linsul Partners

contact us

Does your plant need to expand or upgrade its water treatment? Talk to Linsul's technical team.

Talk to a specialist
150 m³/h WTP for Pamplona's industrial water supply